NY, NJ – Saturday night (Motzah Shabbas) from 10:00 p.m. until 10:00 a.m. the following morning. only one of the George Washington Bridge’s upper level lanes in each direction will be open to traffic so steel beams can be removed from around the bridge’s New Jersey tower.
Join our WhatsApp groupSubscribe to our Daily Roundup Email
In addition traffic in the remaining lane in each direction will be held periodically for approximately 30 minutes at a time.
Your best bet is to use the lower levels of the bridge or use the Lincoln or Holland Tunnel.
Thank you for letting us know.. You are the BEST!!